What are the maintenance instructions for Half & Half?

Proper Pure Tung Oil maintenance helps refresh the finish and maintain protection as the surface wears over time. This guide outlines the correct maintenance process using RMP Finishes Pure Tung Oil, including how dilution differs when starting from Half & Half.

Pure Tung Oil Maintenance Instructions

Follow these steps when a surface finished with Pure Tung Oil needs maintenance:

  1. Clean the surface.

    a. Remove all dirt and debris so the surface is clean before applying oil.

  2. Dilute the Pure Tung Oil.

    a. Dilute the oil to a 2:1 ratio.

    b. When using Half & Half, note that it is pre-diluted to a 1:1 ratio, so it requires an additional 25% more solvent to reach the correct maintenance dilution.

  3. Apply the oil.

    a. Apply 1 thin and even coat to the surface.

  4. Allow to cure.

    a. Let the surface cure for 24 hours before use.

Wrap-Up

Effective Pure Tung Oil maintenance is simple and consistent: clean the surface, dilute the oil correctly to a 2:1 ratio, apply one thin coat, and allow a full 24 hours for curing. Following these steps helps extend the life of your RMP Finishes Pure Tung Oil finish without unnecessary buildup


For product details or to purchase, visit the Half & Half product page on the RMP Finishes site: https://www.rmpfinishes.com/shop/oils/half-and-half/?utm_source=help.rmpfinishes.com.

Did this answer your question? Thanks for the feedback There was a problem submitting your feedback. Please try again later.

Still need help? Contact Us Contact Us